Skip to content
Data
People
Economy
Places
Insights
Area Profiles
Blog
About
Thameside West Public Consultation documents
Greater London Authority
231 files
View Metadata
2693-A-SL-011-xx-08.pdf
(848.04 kB)
2693-A-SL-011-xx-05B.pdf
(985.72 kB)
2693-A-SL-011-xx-13.pdf
(1.36 MB)
2693-A-SL-011-xx-09.pdf
(756.48 kB)
2693-A-SL-011-xx-10.pdf
(752.62 kB)
2693-A-SL-011-xx-11.pdf
(748.74 kB)
Thameside West - Viability Addendum Report_280720 with appendices.pdf
(1.02 MB)
2693-A-SL-011-xx-06.pdf
(1.12 MB)
2693-A-SL-011-xx-03.pdf
(821.26 kB)
2693-A-SL-011-xx-05.pdf
(1010.89 kB)
2693-A-SL-011-xx-05A.pdf
(976.36 kB)
2693-A-SL-011-xx-02.pdf
(790.17 kB)
2693-A-SL-011-xx-07.pdf
(927.12 kB)
2693-A-SL-011-xx-04.pdf
(911.65 kB)
GLA Viability Report_ 070720.pdf
(13.14 MB)
GE Position Note - Revised scheme March 2020.pdf
(3.42 MB)
Updated planning application form.pdf
(1.17 MB)
Schedule of Accommodation - June 2020.PDF
(840.98 kB)
GE Further Addendum June 2020.pdf
(4.85 MB)
GE Note in response to GLA 26 March 2020.pdf
(3.46 MB)
Affordable Housing SA2.pdf
(960.36 kB)
Covering Letter (incl Appendix 1).pdf
(298.52 kB)
200710 -Final Covering letter.pdf
(254.22 kB)
200618 TSW letter of conformity with appendices.pdf
(10.14 MB)
522-PT-MP-TYP-DR-L-PL-1006_S2-P16.pdf
(2.01 MB)
522-PT-MP-TYP-DR-L-PL-1020_S2-P12.pdf
(1.91 MB)
200703 TSW Whole Life Carbon Final.pdf
(727.98 kB)
200703 JW_JA_TC TSWCircular Economy Statement 01 Final.pdf
(434.60 kB)
01_Executive_Summary.pdf
(425.25 kB)
02_Introduction.pdf
(1.26 MB)
03_The_Site_1-2.pdf
(6.90 MB)
522-PT-MP-TYP-DR-L-PL-1019_S2-P10.pdf
(2.21 MB)
522-PT-MP-TYP-DR-L-PL-1031_S2-P08.pdf
(1.08 MB)
03_The_Site_2-2.pdf
(8.08 MB)
08_Technical_Design.pdf
(10.07 MB)
04_Design_Process_and_Evolution.pdf
(4.03 MB)
05_The_Masterplan_1-13.pdf
(5.75 MB)
05_The_Masterplan_2-13.pdf
(1.34 MB)
05_The_Masterplan_3-13.pdf
(4.87 MB)
05_The_Masterplan_4-13.pdf
(3.47 MB)
05_The_Masterplan_5-13.pdf
(2.76 MB)
05_The_Masterplan_6-13.pdf
(2.97 MB)
05_The_Masterplan_7-13.pdf
(4.88 MB)
05_The_Masterplan_8-13.pdf
(1.24 MB)
05_The_Masterplan_9-13.pdf
(990.68 kB)
05_The_Masterplan_10-13.pdf
(2.38 MB)
05_The_Masterplan_11-13.pdf
(2.68 MB)
05_The_Masterplan_12-13.pdf
(1.96 MB)
05_The_Masterplan_13-13.pdf
(4.84 MB)
06_Landscape_Strategy_1-2.pdf
(8.67 MB)
06_Landscape_Strategy_2-2.pdf
(5.53 MB)
07_Access_and_Servicing.pdf
(3.44 MB)
DAS Vol 2_Phase 1_Part1.pdf
(8.19 MB)
DAS Vol 2_Phase 1_Part2.pdf
(8.00 MB)
DAS Vol 2_Phase 1_Part3.pdf
(7.87 MB)
DAS Vol 2_Phase 1_Part4.pdf
(8.86 MB)
DAS Vol 2_Phase 1_Part5.pdf
(8.25 MB)
DAS Vol 2_Phase 1_Part6.pdf
(6.35 MB)
DAS Vol 2_Phase 1_Part7.pdf
(5.43 MB)
DAS Vol 2_Phase 1_Part8.pdf
(6.19 MB)
DAS Vol 2_Phase 1_Part9.pdf
(8.25 MB)
DAS Vol 2_Phase 1_Part10.pdf
(8.26 MB)
DAS Vol 2_Phase 1_Part11.pdf
(8.77 MB)
DAS Vol 2_Phase 1_Part12.pdf
(5.07 MB)
DAS Vol 2_Phase 1_Part13.pdf
(5.17 MB)
DAS Vol 2_Phase 1_Part14.pdf
(8.53 MB)
DAS Vol 2_Phase 1_Part15.pdf
(8.93 MB)
DAS Vol 2_Phase 1_Part16.pdf
(5.78 MB)
DAS Vol 2_Phase 1_Part17.pdf
(6.15 MB)
DAS Vol 2_Phase 1_Part18.pdf
(4.72 MB)
DAS Vol 2_Phase 1_Part19.pdf
(7.50 MB)
DAS Vol 2_Phase 1_Part20.pdf
(5.97 MB)
DAS Vol 2_Phase 1_Part21.pdf
(8.62 MB)
DAS Vol 2_Phase 1_Part22.pdf
(7.35 MB)
DAS Vol 2_Phase 1_Part23.pdf
(8.34 MB)
DAS Vol 2_Phase 1_Part24.pdf
(8.88 MB)
DAS Vol 2_Phase 1_Part25.pdf
(8.55 MB)
DAS Vol 2_Phase 1_Part26.pdf
(8.88 MB)
DAS Vol 2_Phase 1_Part27.pdf
(8.89 MB)
DAS Vol 2_Phase 1_Part28.pdf
(7.31 MB)
2963_Design_Code_01_Introduction.pdf
(2.04 MB)
2963_Design_Code_02_Masterplan_Guidelines_1-2.pdf
(3.78 MB)
2963_Design_Code_02_Masterplan_Guidelines_2-2.pdf
(6.73 MB)
2963_Design_Code_03_Landscape_Guidelines_1-2.pdf
(3.85 MB)
2963_Design_Code_04_Architectural_Guidelines.pdf
(4.01 MB)
2963_Design_Code_03_Landscape_Guidelines_2-2.pdf
(9.28 MB)
2963_Design_Code_05_Development_Guidelines_3-3.pdf
(7.01 MB)
2963_Design_Code_05_Development_Guidelines_1-3.pdf
(10.49 MB)
2963_Design_Code_05_Development_Guidelines_2-3.pdf
(7.71 MB)
2963_Design_Code_06_Appendices_1-4.pdf
(9.76 MB)
2963_Design_Code_06_Appendices_2-4.pdf
(7.38 MB)
2963_Design_Code_06_Appendices_3-4.pdf
(4.54 MB)
2963_Design_Code_06_Appendices_4-4.pdf
(9.68 MB)
2693-A-DEM-001-XX-01.pdf
(1.56 MB)
2693-A-EXSL-011-XX-01.pdf
(1.10 MB)
2693-A-EXSL-001-00-01.pdf
(6.12 MB)
2693-A-LO-011-XX-01.pdf
(2.18 MB)
2693-A-SL-011-xx-01.pdf
(1.12 MB)
2693-A-SL-011-xx-02.pdf
(773.54 kB)
2693-A-SL-011-xx-03.pdf
(803.54 kB)
2693-A-SL-011-xx-04.pdf
(894.08 kB)
2693-A-SL-011-xx-05.pdf
(992.87 kB)
2693-A-SL-011-xx-05A.pdf
(958.20 kB)
2693-A-SL-011-xx-05B.pdf
(967.77 kB)
2693-A-SL-011-xx-06.pdf
(1.10 MB)
2693-A-SL-011-xx-07.pdf
(909.28 kB)
2693-A-SL-011-xx-08.pdf
(830.59 kB)
2693-A-SL-011-xx-09.pdf
(738.86 kB)
2693-A-SL-011-xx-10.pdf
(734.77 kB)
2693-A-SL-011-xx-11.pdf
(731.19 kB)
2693-A-SL-011-xx-13.pdf
(1.34 MB)
A-000-xx-11.pdf
(290.78 kB)
200514_N2693_Design_and_Access_Statement_Planning_Revision_Tracker.pdf
(140.44 kB)
200514_N2693_Parameter_Plans_Planning_Revision_Tracker.pdf
(105.23 kB)
200514_N2693_Design_Codes_Planning_Revision_Tracker.pdf
(148.19 kB)
Phase 1 - Below Ground Drainage Strategy- Part 1.pdf
(8.83 MB)
Phase 1 - Below Ground Drainage Strategy- Part 2.pdf
(1.44 MB)
Construction Logistics Plan Addendum_Part1.pdf
(9.03 MB)
Construction Logistics Plan Addendum_Part2.pdf
(7.87 MB)
Construction Logistics Plan Addendum_Part3.pdf
(7.85 MB)
200513 Energy &SS Addendum Part 1 of 4.pdf
(6.41 MB)
200513 Energy &SS Addendum Part 2 of 4.pdf
(8.85 MB)
200513 Energy &SS Addendum Part 3 of 4.pdf
(8.82 MB)
200513 Energy &SS Addendum Part 4 of 4.pdf
(8.73 MB)
TSW ES Volume 2 Addendum_Part1.pdf
(4.92 MB)
TSW ES Volume 2 Addendum_Part2.pdf
(5.53 MB)
TSW ES Volume 2 Addendum_Part3.pdf
(8.42 MB)
TSW ES Volume 2 Addendum_Part4.pdf
(8.47 MB)
TSW ES Volume 2 Addendum_Part5.pdf
(8.46 MB)
TSW ES Volume 2 Addendum_Part6.pdf
(8.37 MB)
TSW ES Volume 2 Addendum_Part7.pdf
(2.07 MB)
ES Addendum Vol III - Technical Appendices FULL Part 1 of 8.pdf
(7.87 MB)
ES Addendum Vol III - Technical Appendices FULL Part 2 of 8.pdf
(8.98 MB)
ES Addendum Vol III - Technical Appendices FULL Part 3 of 8.pdf
(8.07 MB)
ES Addendum Vol III - Technical Appendices FULL Part 4 of 8.pdf
(8.06 MB)
ES Addendum Vol III - Technical Appendices FULL Part 5 of 8.pdf
(8.94 MB)
ES Addendum Vol III - Technical Appendices FULL Part 6 of 8.pdf
(8.87 MB)
ES Addendum Vol III - Technical Appendices FULL Part 7 of 8.pdf
(8.88 MB)
ES Addendum Vol III - Technical Appendices FULL Part 8 of 8.pdf
(6.22 MB)
200514 TSW ES Addendum Volume I - Main Report.pdf
(7.16 MB)
200514 TSW ES Addendum Non-Technical Summary.pdf
(2.18 MB)
522-PT-MP-TYP-DR-L-PL-1001_S2-P21.pdf
(1.70 MB)
522-PT-MP-TYP-DR-L-PL-1002_S2-P08.pdf
(1.68 MB)
522-PT-MP-TYP-DR-L-PL-1005_S2-P09.pdf
(1.86 MB)
522-PT-MP-TYP-DR-L-PL-1006_S2-P15.pdf
(2.00 MB)
522-PT-MP-TYP-DR-L-PL-1007_S2-P10.pdf
(1.86 MB)
522-PT-MP-TYP-DR-L-PL-1008_S2-P10.pdf
(2.02 MB)
522-PT-MP-TYP-DR-L-PL-1009_S2-P10.pdf
(1.50 MB)
522-PT-MP-TYP-DR-L-PL-1010_S2-P06.pdf
(1.20 MB)
522-PT-MP-TYP-DR-L-PL-1011_S2-P08.pdf
(1.39 MB)
522-PT-MP-TYP-DR-L-PL-1013_S2-P09.pdf
(1.92 MB)
522-PT-MP-TYP-DR-L-PL-1014_S2-P10.pdf
(1.62 MB)
522-PT-MP-TYP-DR-L-PL-1016_S2-P09.pdf
(866.45 kB)
522-PT-MP-TYP-DR-L-PL-1017_S2-P07.pdf
(3.27 MB)
522-PT-MP-TYP-DR-L-PL-1018_S2-P07.pdf
(1.90 MB)
522-PT-MP-TYP-DR-L-PL-1020_S2-P11.pdf
(1.91 MB)
522-PT-MP-TYP-DR-L-PL-1021_S2-P06.pdf
(1.64 MB)
522-PT-MP-TYP-DR-L-PL-1025_S2-P08.pdf
(1.90 MB)
522-PT-MP-TYP-DR-L-PL-1027_S2-P07.pdf
(1.53 MB)
522-PT-MP-TYP-DR-L-PL-1028_S2-P07.pdf
(1.74 MB)
522-PT-MP-TYP-DR-L-PL-1030_S2-P10.pdf
(1.98 MB)
522-PT-MP-TYP-DR-L-PL-1038_S2-P02.pdf
(566.75 kB)
522-PT-MP-TYP-DR-L-PL-1039_S2-P02.pdf
(658.99 kB)
522-PT-PH1-01-DR-L-PL-1011_S4-PL1.pdf
(830.54 kB)
522-PT-PH1-01-DR-L-PL-1013_S4-PL1.pdf
(855.89 kB)
522-PT-PH1-GF-DR-L-PL-1001_S4-PL1.pdf
(1.69 MB)
522-PT-PH1-GF-DR-L-PL-1002_S4-PL1.pdf
(1.33 MB)
522-PT-PH1-RF-DR-L-PL-1991_S4-PL1.pdf
(3.02 MB)
COMBINED Letters of Conformity.pdf
(1.54 MB)
ROL00039_Light Within Report_April 2020 Part 1 of 3.pdf
(7.98 MB)
ROL00039_Light Within Report_April 2020 Part 2 of 3.pdf
(7.91 MB)
ROL00039_Light Within Report_April 2020 Part 3 of 3.pdf
(5.33 MB)
_2018-JMP-P1-01-DR-A-3210.pdf
(821.63 kB)
2018-JMP-1A-AA-DR-A-5000.pdf
(536.67 kB)
2018-JMP-1A-NW-DR-A-4500.pdf
(697.47 kB)
2018-JMP-1B-BB-DR-A-5100.pdf
(535.11 kB)
2018-JMP-1B-NW-DR-A-6000.pdf
(405.33 kB)
2018-JMP-1B-NW-DR-A-6400.pdf
(762.75 kB)
2018-JMP-1B-NW-DR-A-6500.pdf
(1.68 MB)
2018-JMP-1B-SE-DR-A-4600.pdf
(691.26 kB)
2018-JMP-1B-SW-DR-A-6100.pdf
(756.39 kB)
2018-JMP-1B-SW-DR-A-6200.pdf
(594.67 kB)
2018-JMP-P1-02-DR-A-3300.pdf
(582.38 kB)
2018-JMP-P1-12-DR-A-3400.pdf
(895.38 kB)
2018-JMP-P1-14-DR-A-3500.pdf
(425.33 kB)
2018-JMP-P1-15-DR-A-3510.pdf
(870.11 kB)
2018-JMP-P1-16-DR-A-3600.pdf
(359.05 kB)
2018-JMP-P1-18-DR-A-3700.pdf
(801.21 kB)
2018-JMP-P1-19-DR-A-3800.pdf
(381.75 kB)
2018-JMP-P1-CC-DR-A-5200.pdf
(802.66 kB)
2018-JMP-P1-GF-DR-A-3000.pdf
(1.45 MB)
2018-JMP-P1-GF-DR-A-3010.pdf
(1.38 MB)
2018-JMP-P1-M-DR-A-3110.pdf
(1.56 MB)
2018-JMP-P1-NE-DR-A-4200.pdf
(994.34 kB)
2018-JMP-P1-NW-DR-A-4300.pdf
(681.64 kB)
2018-JMP-P1-RF-DR-A-3900.pdf
(458.83 kB)
2018-JMP-P1-SE-DR-A-4400.pdf
(591.49 kB)
2018-JMP-P1-SW-DR-A-4000.pdf
(1.24 MB)
2018-JMP-P1-XX-DR-A-0001.pdf
(1.87 MB)
2018-JMP-P1-XX-DR-A-0010.pdf
(463.62 kB)
200401 Masterplan River Wall Structural Condition Survey Part 2 of 7.pdf
(8.79 MB)
200401 Masterplan River Wall Structural Condition Survey Part 3 of 7.pdf
(8.38 MB)
200401 Masterplan River Wall Structural Condition Survey Part 4 of 7.pdf
(8.95 MB)
200401 Masterplan River Wall Structural Condition Survey Part 5 of 7.pdf
(9.00 MB)
200401 Masterplan River Wall Structural Condition Survey Part 6 of 7.pdf
(8.64 MB)
200401 Masterplan River Wall Structural Condition Survey Part 7 of 7.pdf
(8.36 MB)
200401 Masterplan River Wall Structural Condition Survey Part 1 of 7.pdf
(9.01 MB)
Social Value Report_Part1.pdf
(7.83 MB)
Social Value Report_Part2.pdf
(7.12 MB)
Social Value Report_Part3.pdf
(6.92 MB)
Social Value Report_Part4.pdf
(4.73 MB)
Social Value Report_Part5.pdf
(8.08 MB)
Social Value Report_Part6.pdf
(6.15 MB)
Social Value Report_Part7.pdf
(8.44 MB)
Social Value Report_Part8.pdf
(7.62 MB)
Social Value Report_Part9.pdf
(7.24 MB)
Transport Assessment Addendum_Part1.pdf
(8.96 MB)
Transport Assessment Addendum_Part2.pdf
(3.77 MB)
200515 - Covering letter.pdf
(359.52 kB)
Access Statement.pdf
(7.37 MB)
Aviation Safeguarding Assessment.pdf
(7.06 MB)
Affordable Housing Statement Addendum.pdf
(949.65 kB)
Delivery & Servicing Requirements - Summary Note_Revised Massing.pdf
(3.10 MB)
FINAL Accomodation Schedule_11.05.20.pdf
(311.79 kB)
Financial Viability Assessment Addendum.pdf
(943.28 kB)
Phase 1 - Fire Strategy Summary.pdf
(5.10 MB)
Planning Statement Addendum (May 2020).pdf
(8.72 MB)
River Wall Update Drawing.pdf
(2.26 MB)
Schedule of Accommodation_15.05.20.pdf
(1.36 MB)
Updated cil_questions form..pdf
(818.13 kB)
Updated planning application form.pdf
(948.23 kB)
https://www.london.gov.uk