Transport for London (TfL)
Transport for London (TfL) is a local government body responsible for most aspects of the transport system in Greater London. Its role is to implement the transport strategy and to manage transport services across London. TFL have responsibility for London Underground, London Rail, and Surface Transport.
- Updated 15 days ago
Number of Bicycle Hires
Transport for London (TfL)Total number of hires of the Santander Cycle Hire Scheme, by day, month and year. Data for each day since the launch on 30 July 2010. - Updated a month ago
Transport Crime in London
Transport for London (TfL)Number of crimes and crime rate by type of public transport, including bus, LU / DLR, London Overground, and London Tramlink. Monthly data released 3 months at a time at end of each quarter. The BTP is responsible for policing the rail network in London, including the TfL managed London Underground (LU), the Docklands Light Railway (DLR), London Tramlink and the London Overground (LO) services. Crime figures for the LU, DLR, London Tram... - Updated 3 months ago
London Underground Average Monthly Temperatures
Transport for London (TfL)London Underground records temperatures across the Underground in order to inform our cooling initiatives. Platform temperatures on the deep Tube are routinely monitored using data loggers. Average monthly evening peak temperatures since 2013 are provided on this page. We are investing millions as part of a long-term programme to ensure we can deliver more services, and continue to introduce new trains to meet growing customer numbers w... - Updated 3 months ago
Public Transport Journeys by Type of Transport
Transport for London (TfL)Number of journeys on the public transport network by TFL reporting period, by type of transport. Data is broken down by bus, underground, DLR, tram, Overground and cable car. Period lengths are different in periods 1 and 13, and the data is not adjusted to account for that. Docklands Light Railway journeys are based on automatic passenger counts at stations. Overground and Tram journeys are based on automatic on-carriage passenger co... - Updated 4 months ago
Number of Buses by Type of Bus in London
Transport for London (TfL)Number of buses in the TFL fleet by type of bus in London. The fleet size varies slightly from year to year in relation to the placing of route contracts. The hydrogen fuel cell buses are also hybrid. - Updated 5 months ago
Camera Captures and Confirmed Vehicles seen in the Congestion Charge Zone by Month
Transport for London (TfL)Camera Captures and Confirmed Vehicles seen in the Congestion Charge Zone by Month Camera Captures and Confirmed Vehicles seen in the Congestion Charge Zone by Month during charging hours. Camera Captures since July 2010 and Confirmed Vehicles since October 2016. The count of captures is based on the unique Automatic Number Plate Recognition (ANPR) camera captures per day, which are added up to provide the total number for the month. ... - Updated 6 months ago
Cycle Hire availability
Transport for London (TfL)This TfL feed contains the name, location, co-ordinates and maximum number of docking points for all operational Santander Cycle Hire docking stations. It also contains the number of available bikes (excluding locked or faulty bikes), and number of available docking points. Documentation is available from the TfL Unified API - Updated 3 years ago
Cycle Flows on the TFL Road Network
Transport for London (TfL)This dataset will no longer be updated. Cycle flows on the Transport for London Road Network (TLRN). The purpose of this indicator is to assess the level of cycle use on the TLRN. The overall ambition is to increase cycling levels by 400% such that by 2025 cycling will equate to a 5% mode share of all journey trips. This indicator does not represent cycling across London as a whole, It only represents cycling on the 5% of London’s road... - Updated 3 years ago
Key Performance Indicators on the TFL Road Network
Transport for London (TfL)This dataset will no longer be updated. Selected key performance indicators on the TFL Road Network. Number of hours of Serious and Severe Disruption on the road network by planned and unplanned status, journey time reliability, and total number of works undertaken on the road network. TLRN = TFL Road Network The maximum permissibile total number of road works allowed on the TLRN was capped at 3,250 for any one period, in Period 1 of 2... - Updated 4 years ago
Characteristics of Night Bus Users
Transport for London (TfL)Breakdown of night and day bus users by gender, age, ethnicity, household income, disability, frequency and purpose of use. This dataset is included in the Greater London Authority's Night Time Observatory. Click here to find out more.