
Planning
- Created 2 years ago
Flood Risk
Planning Constraints MapThe Flood Zones show the probability of river and sea flooding, ignoring the presence of defences. There are four zones, 1, 2, 3a and 3b, that reflect the annual probability of flooding happening. This map shows all areas with more than a 1 in 1,000 annual probability of either river or sea flooding by combining zones 2, 3a and 3b. If you want... - Updated 2 years ago
Thames Estuary Production Corridor: Fashion Design and Manufacturing Sector: evidence base and emerging areas of action
Greater London Authority (GLA)This dataset was collated to provide evidence for supporting and investing in the high growth fashion design and manufacturing sector in the Thames Estuary region. This evidence base was created as part of a research commission funded by MHCLG in 2020, which set out to make a case for investment in cultural infrastructure across the region. This document provides a summary... - Updated 2 years ago
Thames Estuary Production Corridor:Screen Industries Sector-evidence base and emerging areas of action
Greater London Authority (GLA)This dataset was collated to provide evidence for supporting and investing in the high growth screen industries sector in the Thames Estuary region. This evidence base was created as part of a research commission funded by MHCLG in 2020, which set out to make a case for investment in cultural infrastructure across the region. This document provides a summary... - Updated 2 years ago
Wimbledon Park Golf Course Consultation Documents 9 May to 8 June 2024
Greater London Authority (GLA) - Created 2 years ago
Wimbledon Park Golf Course post consultation documents
Greater London Authority (GLA) - Created 2 years ago
Secondary Substation Feeding Areas
UK Power NetworksA shapefile containing the postcode areas supplied by secondary substations. The dataset is generalised using our GIS customer connectivity model. Each Secondary Substation's connected LV Network is traced out to its electrical extents, including all connected customers. Using the geographic position of customer connections and key network points of both the Substation being traced and surrounding Substation's network, a Voronoi diagram is... - Updated 2 years ago
London Plan AMR 19 tables and data
Greater London Authority (GLA)Excel spreadsheets containing the data from London Plan AMR 19 will be published here soon. For more information see Monitoring the London Plan. AMR page 131
PDF File
ZIP File
Spreadsheet
CSV File
GeoPackage
Document
Image
Website
GeoJSON