Instant search is disabled. Press enter to search.
Try typing: transport, buses, finance, fire, health, travel, tube...
Greater London
  • Updated 3 days ago

    Camera Captures and Confirmed Vehicles seen in the Congestion Charge Zone by Month

    Camera Captures and Confirmed Vehicles seen in the Congestion Charge Zone by Month Camera Captures and Confirmed Vehicles seen in the Congestion Charge Zone by Month during charging hours. Camera Captures since July 2010 and Confirmed Vehicles since October 2016. The count of captures is based on the unique Automatic Number Plate Recognition (ANPR) camera captures per day, which are added up to provide the total number for the month. ...
  • Updated 4 days ago

    Transport Crime in London

    Number of crimes and crime rate by type of public transport, including bus, LU / DLR, London Overground, and London Tramlink. Monthly data released 3 months at a time at end of each quarter. The BTP is responsible for policing the rail network in London, including the TfL managed London Underground (LU), the Docklands Light Railway (DLR), London Tramlink and the London Overground (LO) services. Crime figures for the LU, DLR, London Tra...
  • Updated 4 days ago

    London Average Air Quality Levels

    The data shows roadside and background average readings for Nitric Oxide, Nitrogen Dioxide, Oxides of Nitrogen, Ozone, Particulate Matter (PM10 and PM2.5), and Sulphur Dioxide. Measured in Micrograms per Cubic Meter of Air (ug/m3). The spreadsheet shows which Index level each reading falls in, and contains charts showing pollutant levels by time of day per month. Trend graphs of Nitrogen Dioxide and Particulate Matter PM2.5 are on the ...
  • Updated 10 days ago

    Public Transport Journeys by Type of Transport

    Number of journeys on the public transport network by TFL reporting period, by type of transport. Data is broken down by bus, underground, DLR, tram, Overground and cable car. Period lengths are different in periods 1 and 13, and the data is not adjusted to account for that. Docklands Light Railway journeys are based on automatic passenger counts at stations. Overground and Tram journeys are based on automatic on-carriage passenger cou...
  • Updated 11 days ago

    London Underground Performance Reports

    Transport For Londons's key London Underground performance measures (since May-11). The key measures of underground performance contained in the Excel spreadsheet are: Total operated kilometres, Total number of lost customer hours (LCH) (all causes), Average excess journey time, and Percentage of scheduled operated. More indicators are available from the TFL monthly performance data Almanac. Also available from TFL are a list of tube...
  • Updated 13 days ago

    Key Performance Indicators on the TFL Road Network

    Selected key performance indicators on the TFL Road Network. Number of hours of Serious and Severe Disruption on the road network by planned and unplanned status, journey time reliability, and total number of works undertaken on the road network. TLRN = TFL Road NetworkThe maximum permissibile total number of road works allowed on the TLRN was capped at 3,250 for any one period, in Period 1 of 2013/14 until the end of the financial ye...
  • Updated 13 days ago

    LFB/LFEPA payments over £250 - 2017/18

    This dataset is for 2017/18 only. Earlier years are available here. Payments over £250 made by the London Fire Brigade (LFEPA) as part of the government and Mayor of London's transparency agenda. As of November 2012 the threshold for expenditure changed from £500 to £250 at request of the Mayor. The Local Government Transparency Code 2015 requires the data to indicate VAT for payments which cannot be recovered; there are no such paymen...
  • Updated 14 days ago

    GLA Poll Results

    The GLA undertakes regular polling of Londoners' views. The results from these polls appear on this page. December 2017 – Rail services  Link to PDF of topline (PDF) November 2017 – Workplace equality Link to PDF of topline (PDF) September 2017 – Keeping Londoners safe Link to PDF of topline (PDF) August 2017 – World Athletics Championships Link to PDF of topline (PDF) July 2017 – World Para-athletics Championships Link to PDF...
  • Updated 18 days ago

    LFEPA procurement information - current contracts

    The Local Government Transparency Code 2015 requires the publication of details of every contract, commissioned activity, purchase order, framework agreement and any other legally enforceable agreement with a value that exceeds £5,000. The London Fire and Emergency Planning Authority (LFEPA) standing orders (and code of practice on tenders and contracts) provides for tenders for purchases of £10,000 or more in value. Standing orders and...
  • Updated 18 days ago

    Incident response times - Fire Facts

    This Fire Facts report sets out the key information on the response times to the 999 calls received by the London Fire Brigade. It includes data and analysis on the various stages of emergency response from how long it takes people to call the fire brigade when a fire starts to how long it takes to handle the 999 call and for fire engines to arrive on scene and resolve the incident. The methodology for counting fire engine response ti...