Topics
Environment
Income, Poverty and Welfare
Planning
Demographics
(5)
Housing
(5)
Show 10 more...
amp;amp;topics
(No further facets)
amp;amp;tag
(No further facets)
amp;amp;org
(No further facets)
amp;org
(No further facets)- Created 3 months ago
Secondary Substation Feeding Areas
UK Power NetworksA shapefile containing the postcode areas supplied by secondary substations. The dataset is generalised using our GIS customer connectivity model. Each Secondary Substation's connected LV Network is traced out to its electrical extents, including all connected customers. Using the geographic position of customer connections and key network points of both the Substation being traced and surrounding Substation's network, a Voronoi diagram... - Updated a year ago
London Wellbeing and Sustainability Measure
Greater London Authority (GLA)The Mayor of London committed to developing a London Wellbeing and Sustainability Measure in his 2021 manifesto. This was to help measure London’s success as a place to live and work for all its residents. It would counteract the fact that, for years, London’s success has been mostly measured only in terms of its material wealth. After a comprehensive and thorough development process, we are pleased to present the first iteration of th... - Created a year ago
Infrastructure upgrades
UK Power NetworksThis list provides details of current plans (as stated in the Development Proposals of the last LTDS publication) for the development of UK Power Networks' three licence areas over the next five years. The LTDS is updated twice a year: end of May; and end of November. The plans are subject to change in both their content and timing. All the schemes listed provide an increase in network capacity. Projects which have only an asset replace... - Updated a year ago
London Wellbeing and Sustainability Measure (development work)
Greater London Authority (GLA)The Mayor of London committed to developing a London Wellbeing and Sustainability Measure in his 2021 manifesto. This was to help measure London’s success as a place to live and work for all its residents. It would counteract the fact that, for years, London’s success has been mostly measured only in terms of its material wealth. GLA City Intelligence led the development of this measure of wellbeing and sustainability. It brings togeth... - Created 2 years ago
Enable
UK Power NetworksAs part of our Enable project, we estimated the projected number of on-street disabled parking bays and Blue Badge holders in our licence areas by 2030. This data is available at the Lower Layer Super Output Area (LSOA) level. We hope that this data will help local authorities and charge point operators plan for accessible transport provision for customers. More information on what we're doing for accessible transport can be found at UK... - Updated 7 years ago
Mortality Risk from High Temperatures in London (Triple Jeopardy Mapping)
Greater London Authority (GLA)A heatwave refers to a prolonged period of unusually hot weather. While there is no standard definition of a heatwave in England, the Met Office generally uses the World Meteorological Organization definition of a heatwave, which is "when the daily maximum temperature of more than five consecutive days exceeds the average maximum temperature by 5°C, the normal period being 1961-1990". They are common in the northern and southern hemisph...