Interruptions Incentive Scheme
UK Power Networks
Added 7 months ago
The dataset provides detailed information about UK Power Networks' unplanned fault reporting under the Ofgem Interruptions Incentive Scheme (IIS).It includes key characteristics such as: Date/time fault start/end Number of customers affected Restoration stages Cause and main equipment involved Status of fault in terms of its exclusion from the IIS scheme due to it being a one-off /severe weather fault The...
Low Carbon Technologies (LCT) Connected by LSOA (Lower Super Output Area)
UK Power Networks
Added 7 months ago
Volume of Domestic Low Carbon Technologies (LCT) for both generation and demand (under 1MW) connected.
Distribution Future Energy Scenarios
UK Power Networks
Added 7 months ago
The Distribution Future Energy Scenarios (DFES) are primarily a series of granular scenario-based forecasts for key drivers of demand and generation technologies whose deployment are essential to achieving Net Zero. This includes EVs, decarbonised heating such as heat pumps and district heat networks, and forms of renewable energy generation and storage. For each driver, a range of forecasts are produced under different assumptions.
Secondary Substation Feeding Areas
UK Power Networks
Added almost 2 years ago
A shapefile containing the postcode areas supplied by secondary substations.The dataset is generalised using our GIS customer connectivity model.Each Secondary Substation's connected LV Network is traced out to its electrical extents, including all connected customers. Using the geographic position of customer connections and key network points of both the Substation being traced and surrounding Substation's network, a Voronoi diagram is...
Infrastructure upgrades
UK Power Networks
Added over 2 years ago
This list provides details of current plans (as stated in the Development Proposals of the last LTDS publication) for the development of UK Power Networks' three licence areas over the next five years. The LTDS is updated twice a year: end of May; and end of November.The plans are subject to change in both their content and timing. All the...