Data Centres Utilisation
UK Power Networks
Added 7 months ago
This dataset shows the maximum observed utilisations of operational data centres identified in UK Power Networks' region.The utilisations have been determined using actual demand data from connected sites within UK Power Networks licence areas, from 1 January 2023 onwards.Maximum utilisations are expressed proportionally, by comparing the maximum half-hourly observed import power seen across the site's meter point(s), against the meter's...
Data Centre Profiles
UK Power Networks
Added 7 months ago
This dataset shows the half-hourly load profiles of identified data centres within UK Power Networks' licence areas.The loads have been determined using actual demand data from connected sites within UK Power Networks' licence areas, from 1 January 2023 onwards.Loads are expressed proportionally, by comparing the half-hourly observed import power seen across the site's meter point(s), against the meter's maximum import...
Interruptions Incentive Scheme
UK Power Networks
Added 7 months ago
The dataset provides detailed information about UK Power Networks' unplanned fault reporting under the Ofgem Interruptions Incentive Scheme (IIS).It includes key characteristics such as: Date/time fault start/end Number of customers affected Restoration stages Cause and main equipment involved Status of fault in terms of its exclusion from the IIS scheme due to it being a one-off /severe weather fault The...
Low Carbon Technologies (LCT) Connected by LSOA (Lower Super Output Area)
UK Power Networks
Added 7 months ago
Volume of Domestic Low Carbon Technologies (LCT) for both generation and demand (under 1MW) connected.
Distribution Future Energy Scenarios
UK Power Networks
Added 7 months ago
The Distribution Future Energy Scenarios (DFES) are primarily a series of granular scenario-based forecasts for key drivers of demand and generation technologies whose deployment are essential to achieving Net Zero. This includes EVs, decarbonised heating such as heat pumps and district heat networks, and forms of renewable energy generation and storage. For each driver, a range of forecasts are produced under different assumptions.
Flexibility dispatches
UK Power Networks
Added over 1 year ago
This dataset reports on UK Power Networks' use of paid flexibility services. UK Power Networks uses flexibility (demand/generation turn up/down) in London, the South East, and the East of England to manage electricity flows on the local electricity distribution network.
London power networks vectorisation
UK Power Networks
Added over 1 year ago
The GIS (Geographic Information System) vectorisation project will deliver the incremental digital conversion of our legacy geospatial network records. This dataset defines the sub-areas which will be incrementally delivered, detailing corresponding current status and planned completion dates. This allows users to understand the current and future coverage of digital geospatial network records as the project progresses.
Secondary Substation Feeding Areas
UK Power Networks
Added almost 2 years ago
A shapefile containing the postcode areas supplied by secondary substations.The dataset is generalised using our GIS customer connectivity model.Each Secondary Substation's connected LV Network is traced out to its electrical extents, including all connected customers. Using the geographic position of customer connections and key network points of both the Substation being traced and surrounding Substation's network, a Voronoi diagram is...
Live power cuts
UK Power Networks
Added over 2 years ago
This dataset is a feed from UK Power Networks' Distribution Network Management System - PowerOn, showing near real time power cut (fault) data. It includes planned and unplanned power cuts. Users will be able to consume live fault data via API.Note: the geopoints are created from aggregated post code data to protect individual customer privacy; any power cuts which contains...
Infrastructure upgrades
UK Power Networks
Added over 2 years ago
This list provides details of current plans (as stated in the Development Proposals of the last LTDS publication) for the development of UK Power Networks' three licence areas over the next five years. The LTDS is updated twice a year: end of May; and end of November.The plans are subject to change in both their content and timing. All the...